HANOI – HAI PHONG HIGHWAY PROJECT
19/06/2013 00:00:00

(Photo of Hanoi – Hai Phong expressway project)

(Photo Hanoi – Hai Phong expressway)
Average cross-section width is 100m, sidewalk width is from 32.5m to 35m with 6 lanes, design speed is 120km/h, 2 lanes for emergency stop, a separate barrier in the middle, trees on both sides, and some space in some necessary positions. Cars with a design speed of less than 60km/h and motorcycles are not allowed on this highway. The whole link has 6 interchanges designed at varying levels and 22 overpasses.
The project is under construction with 6 packages, with a total completion time of 43 months

A member company of BYM Group will carry out a number of works to meet the customer’s progress requirements.