The Rach Mieu 2 Bridge and Approach Road Project, connecting Tien Giang and Ben Tre provinces, has a total length of approximately 17.6 km, including nearly 2 km for the main bridge. The bridge is designed with four lanes for motor vehicles, a design speed of 80 km/h, and two mixed-traffic lanes. The project has a total investment of over VND 6.8 trillion funded by the state budget and commenced construction in March 2022.

The main bridge structure is a two-plane cable-stayed bridge with a prestressed reinforced concrete girder system and a main span arrangement of 120 m + 270 m + 120 m. Under Contract Package XL02, Vinh Hung was selected as the contractor responsible for supplying and installing the stay-cable system, comprising 471.8 tonnes of stay cables, for Towers P19 and P20.

Towers P19 and P20 are designed in an H-shape using reinforced concrete and prestressed reinforced concrete, supported by bored pile foundations. Each tower is founded on 24 piles with a diameter of 2 m and a length of 80 m. The stay-cable system consists of 112 cables arranged in two cable planes and utilizes Parallel Strand System (PSS) cables, with each cable comprising between 31 and 55 strands.

Rach Mieu 2 Cable-Stayed Bridge Project

Project information

Package Name
Package Name

Contract Package XL02: Construction of Rach Mieu 2 Cable-Stayed Bridge (between the two anchorage piers) (Km5+913 – Km6+423), Including detailed design and inland waterway traffic safety works

Contractor(s)
Contractor(s)

My Thuan Project Management Board

Total Investment
Total Investment

VND 6.8 trillion

Vinh Hung Scope of Work
Vinh Hung Scope of Work

Supply and installation of the stay-cable system (471.8 tonnes of stay cables) for Towers P19 and P20.

Complete Year
Complete Year

2025